2010/01/28

Day H... heating starts to work

Štítky: heating

2010/01/27

Sheep wool, work goes on

Štítky: isolation, sheep, wool

Gass connected! -27C

Štítky: gass connection, labe, male valy

2010/01/26

Sheep wool, first tryies to fix

Štítky: isolation, wool

2010/01/24

Preparations for taps

Štítky: bathroom, demolition, myself, water

Concrete table slowly appears..

Štítky: bathroom, concrete

2010/01/22

Water goes to house AGAIN

Štítky: water connection

Toilet reinstalled

Štítky: myself, toilet

Bathroom - plasters move forward

Štítky: bathroom, plaster

2010/01/21

Kitchen moves slowly fwd

Štítky: kitchen, plaster, wall

Sheep wool arrived.. first experiments with installation

Štítky: isolation, sheep, wool

2010/01/19

Frame for ceiling in verandah

Štítky: ceiling, isolation, verandah

2010/01/18

Kitchen project - smaller then people are used to those days

Štítky: inspiration, kitchen, plans, wall

2010/01/14

Bathroom - making concrete table into form

Štítky: bathroom, concrete, video


Updated plasters - fine

Štítky: plaster

2010/01/11

Even more snow

Štítky: snow

2010/01/09

Snow so much

Štítky: snow

2010/01/07

Base for toilet - fixed

Štítky: me, myself, toilet

Labels

myself (131) wood (36) floor (34) concrete (26) bathroom (24) demolition (23) plaster (22) tiles (21) kitchen (19) stone (19) garden (18) painting (18) doors (15) me (15) roof (15) wall (11) isolation (10) plans (10) video (9) granite stair (8) heating (8) male valy (8) ceiling (7) inspiration (7) osb (7) outdoor (7) digging (6) struts (6) flowers (5) wool (5) antient wall (4) bedroom (4) removing trash (4) tadelakt (4) toilet (4) tube (4) cellar (3) electricity (3) lighting (3) panorama (3) snow (3) water (3) badroom (2) fire (2) gass connection (2) how to (2) old struts (2) roof windows (2) sanding (2) sheep (2) stairs (2) vegetables (2) verandah (2) water connection (2) windows (2) Child room (1) Diana (1) Gant (1) Naoko (1) PU foam (1) Roman (1) appricots (1) backyard (1) basin (1) blood (1) brushing (1) conductor (1) design (1) diamond (1) dishwasher (1) doorknob (1) drains (1) excavation (1) fabion (1) foam (1) glass tiles (1) grill (1) grouting (1) hedge fence (1) history (1) iron (1) knob (1) labe (1) lighting conductor (1) lomography (1) loundry (1) material supply (1) papers (1) pointing (1) rose (1) rubbish (1) start (1) water tabs (1)

Archive

  • ►  2011 (2)
    • ►  02 (1)
    • ►  01 (1)
  • ▼  2010 (196)
    • ►  12 (3)
    • ►  11 (9)
    • ►  10 (4)
    • ►  08 (8)
    • ►  07 (25)
    • ►  06 (34)
    • ►  05 (29)
    • ►  04 (24)
    • ►  03 (24)
    • ►  02 (16)
    • ▼  01 (20)
      • Day H... heating starts to work
      • Sheep wool, work goes on
      • Gass connected! -27C
      • Sheep wool, first tryies to fix
      • Preparations for taps
      • Concrete table slowly appears..
      • Water goes to house AGAIN
      • Toilet reinstalled
      • Bathroom - plasters move forward
      • Kitchen moves slowly fwd
      • Sheep wool arrived.. first experiments with instal...
      • Frame for ceiling in verandah
      • Kitchen project - smaller then people are used to ...
      • Bathroom - making concrete table into form
      • Updated plasters - fine
      • Even more snow
      • Snow so much
      • Base for toilet - fixed
      • Main water connecton - current state.. not too good
      • Ceilings almost finished
  • ►  2009 (97)
    • ►  12 (13)
    • ►  11 (16)
    • ►  10 (9)
    • ►  09 (10)
    • ►  08 (11)
    • ►  07 (11)
    • ►  06 (5)
    • ►  04 (1)
    • ►  03 (10)
    • ►  02 (7)
    • ►  01 (4)
Awesome Inc. theme. Powered by Blogger.