mv22 [*1834]

2010/01/27

Gass connected! -27C

Štítky: gass connection, labe, male valy

Labels

myself (131) wood (36) floor (34) concrete (26) bathroom (24) demolition (23) plaster (22) tiles (21) kitchen (19) stone (19) garden (18) painting (18) doors (15) me (15) roof (15) wall (11) isolation (10) plans (10) video (9) granite stair (8) heating (8) male valy (8) ceiling (7) inspiration (7) osb (7) outdoor (7) digging (6) struts (6) flowers (5) wool (5) antient wall (4) bedroom (4) removing trash (4) tadelakt (4) toilet (4) tube (4) cellar (3) electricity (3) lighting (3) panorama (3) snow (3) water (3) badroom (2) fire (2) gass connection (2) how to (2) old struts (2) roof windows (2) sanding (2) sheep (2) stairs (2) vegetables (2) verandah (2) water connection (2) windows (2) Child room (1) Diana (1) Gant (1) Naoko (1) PU foam (1) Roman (1) appricots (1) backyard (1) basin (1) blood (1) brushing (1) conductor (1) design (1) diamond (1) dishwasher (1) doorknob (1) drains (1) excavation (1) fabion (1) foam (1) glass tiles (1) grill (1) grouting (1) hedge fence (1) history (1) iron (1) knob (1) labe (1) lighting conductor (1) lomography (1) loundry (1) material supply (1) papers (1) pointing (1) rose (1) rubbish (1) start (1) water tabs (1)

Archive

  • ►  2011 (2)
    • ►  02 (1)
    • ►  01 (1)
  • ▼  2010 (196)
    • ►  12 (3)
    • ►  11 (9)
    • ►  10 (4)
    • ►  08 (8)
    • ►  07 (25)
    • ►  06 (34)
    • ►  05 (29)
    • ►  04 (24)
    • ►  03 (24)
    • ►  02 (16)
    • ▼  01 (20)
      • Day H... heating starts to work
      • Sheep wool, work goes on
      • Gass connected! -27C
      • Sheep wool, first tryies to fix
      • Preparations for taps
      • Concrete table slowly appears..
      • Water goes to house AGAIN
      • Toilet reinstalled
      • Bathroom - plasters move forward
      • Kitchen moves slowly fwd
      • Sheep wool arrived.. first experiments with instal...
      • Frame for ceiling in verandah
      • Kitchen project - smaller then people are used to ...
      • Bathroom - making concrete table into form
      • Updated plasters - fine
      • Even more snow
      • Snow so much
      • Base for toilet - fixed
      • Main water connecton - current state.. not too good
      • Ceilings almost finished
  • ►  2009 (97)
    • ►  12 (13)
    • ►  11 (16)
    • ►  10 (9)
    • ►  09 (10)
    • ►  08 (11)
    • ►  07 (11)
    • ►  06 (5)
    • ►  04 (1)
    • ►  03 (10)
    • ►  02 (7)
    • ►  01 (4)
Awesome Inc. theme. Powered by Blogger.